The turnkey construction of an industrial building with an ABK has been completed.
- arrangement of foundations;
- installation of sandwich panels enclosing structures;
- installation of concrete floors with epoxy coating Monopol;
- filling of openings (stained glass windows, doors, industrial gates);
- installation of internal networks of sewerage, water supply, gas supply, power supply, electric lighting, heating and ventilation, fire and security alarms;
- finishing works;
- arrangement of external power supply, gas supply, sewage and water supply networks;
- landscaping (asphalt pavement and lawn).