Главная Company Our clients OOO TF "SHININVEST"

OOO TF "SHININVEST"

OOO TF "SHININVEST"
 

Reviews

22 мая 2017

In May 2017, the company CJSC Stroytechnologiya carried out work on the installation of concrete floors with a reinforced top layer at the facility: "Auto shop for the sale of tires", located at the address: Chelyabinsk, Dovator str., 1B, with an area of 900 m2.


   The specialists of Stroytechnologiya CJSC optimized the design solutions takin...

In May 2017, the company CJSC Stroytechnologiya carried out work on the installation of concrete floors with a reinforced top layer at the facility: "Auto shop for the sale of tires", located at the address: Chelyabinsk, Dovator str., 1B, with an area of 900 m2.


   The specialists of Stroytechnologiya CJSC optimized the design solutions taking into account our requirements and performed the work efficiently and on time.
   The company "Shininvest" recommends CJSC "Stroytechnologiya" as a reliable partner who clearly fulfills the obligations assumed.

Читать весь отзыв
Original review file
A.A. Karjakin
Construction Director
LLC "SHININVEST"
A.A. Karjakin
22 июля 2017
   In July 2017, the company CJSC Stroytechnologiya carried out work on the installation of concrete floors with a reinforced top layer at the facility: "Auto shop for the sale of tires", located in Zlatoust, with an area of 775 m2.
   The floor coverings are made at a high professional level using advanced technologies and materials.
   The c...
   In July 2017, the company CJSC Stroytechnologiya carried out work on the installation of concrete floors with a reinforced top layer at the facility: "Auto shop for the sale of tires", located in Zlatoust, with an area of 775 m2.
   The floor coverings are made at a high professional level using advanced technologies and materials.
   The company "Shininvest" recommends JSC "Stroytechnologiya" as a reliable partner who clearly fulfills the obligations assumed.
Читать весь отзыв
Original review file
A.A. Karjakin
Construction Director
LLC "SHININVEST"
A.A. Karjakin
14 апреля 2010
At the facility of LLC TF "Shininvest" "Warehouse No. 9" on Consumer 2nd Street, work was carried out on the installation of reinforced concrete slab with a reinforced top layer, with a total area of 2000 m2.  All works are performed in accordance with the requirements of the regulatory documentation approved by the estimate, with high quality.
...
At the facility of LLC TF "Shininvest" "Warehouse No. 9" on Consumer 2nd Street, work was carried out on the installation of reinforced concrete slab with a reinforced top layer, with a total area of 2000 m2.  All works are performed in accordance with the requirements of the regulatory documentation approved by the estimate, with high quality.
   This company has an advanced material and technical base, extensive work experience, qualified managers and performers of works.
   We recommend the construction company JSC "Stroytechnologiya" to carry out this type of work at an optimal price and with a high level of quality.
Читать весь отзыв
Original review file
A.A. Karjakin
Construction Director
LLC "TF" SHININVEST "
A.A. Karjakin
no goodtest