USMK Plant

USMK Plant
 

Reviews

09 февраля 2018
JSC Stroytechnologiya in November 2017 carried out work on the installation of a concrete floor with a reinforced top layer at the facility: "Production Workshop", located at the address: Chelyabinsk, Kopeyskoe Highway, 50, with an area of 2000 m2.
   In view of the fact that high-tech equipment for plasma cutting of metal was installed in our ...
JSC Stroytechnologiya in November 2017 carried out work on the installation of a concrete floor with a reinforced top layer at the facility: "Production Workshop", located at the address: Chelyabinsk, Kopeyskoe Highway, 50, with an area of 2000 m2.
   In view of the fact that high-tech equipment for plasma cutting of metal was installed in our workshop, high-precision CNC machines for concrete floors had high requirements for strength, evenness and wear resistance.
   The specialists of this organization, taking into account our wishes, have developed and proposed a technical task. The work was carried out in accordance with the requirements of regulatory documentation and in compliance with all technological processes of reinforcement, laying concrete and applying a reinforcing layer.
   As a result, the finished coating fully satisfied the requirements for the operation of the floors.
   We recommend JSC Stroytechnologiya to perform works on the installation of concrete floors of industrial buildings as an experienced and reliable contractor.   
 
Читать весь отзыв
Original review file
Kononenko V.I.
General manager
LLC "USMK"
Kononenko V.I.
no goodtest