reconstruction of the room 800 m2 for the location of the steam boiler house
- dismantling of wall structures, floor, filling of openings;
- supply and installation of m/c half-timbers;
- arrangement of internal partitions (wall sandwich panels);
- arrangement of foundations for boiler equipment;
- construction of fused waterproofing of the roof;
- installation of concrete floors with topping and polyurethane cement coating Monopol Policrete 610;
- filling of openings (stained glass windows, doors, industrial gates);
- installation of internal networks of sewerage, water supply, power supply, electric lighting, heating and ventilation, fire and security alarms;
- finishing works;
- arrangement of external sewerage and water supply networks;
- landscaping (asphalt pavement and lawn).